School Gas Steam Normal Pressure Water Tube Boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :School Gas Steam Normal Pressure Water Tube Boiler
  • Supply Capacity : 10 units/month :School Gas Steam Normal Pressure Water Tube Boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • (PPT) Energy Conservation PPT | Mayadhar Swain - Academia.edu

    • Use only treated water in boilers . A scale formation of1mm thickness on the water side increases fuel consumption by 5-8% • Stop steam leakage. Steam leakage from a 3mm-diameter hole on pipeline carrying steam at 7kg/cm2 would waste 32kl of fuel oil per year amounting to a …Get Price

  • (PPT) Energy Conservation PPT | Mayadhar Swain - Academia.edu

    • Use only treated water in boilers . A scale formation of1mm thickness on the water side increases fuel consumption by 5-8% • Stop steam leakage. Steam leakage from a 3mm-diameter hole on pipeline carrying steam at 7kg/cm2 would waste 32kl of fuel oil per year amounting to a …Get Price

  • Combined Cycle Power Plant - an overview | ScienceDirect

    Combined-cycle power plants (Fig. 2.3) are compound gas turbine–steam turbine systems wherein the extreme hot exhaust from a gas turbine is employed to run a boiler, and the steam thus produced is fed into a steam turbine to generate power.These plants can deliver high power output at efficiencies as high as 50%–60% with low emissions and produce 50% more …Get Price

  • Burnham boilers

    I have a CHG 150 direct vent, gas hot water boiler, I installed it in January 2013 it has worked fine. 2013, 2014, 2015. I brought up, my water level to clear the low water safety, I put a little water in the condensate tube at the bottom to create a neg. draw.Get Price

  • 1.2. Process Flow Diagram (PFD) | Diagrams for

    Jul 03, 2012 · The first exchanger cools the effluent gas and generates steam needed in the plant. The second exchanger uses cooling water to reach the desired exit temperature of 38°C. These exchangers are to be designated as E-107 (reactor effluent boiler) and E …Get Price

  • Combined Cycle Power Plant - an overview | ScienceDirect

    Combined-cycle power plants (Fig. 2.3) are compound gas turbine–steam turbine systems wherein the extreme hot exhaust from a gas turbine is employed to run a boiler, and the steam thus produced is fed into a steam turbine to generate power.These plants can deliver high power output at efficiencies as high as 50%–60% with low emissions and produce 50% more …Get Price

  • Specification of Rupture Disk Burst Pressure

    Rupture disks are replaced after actuation or periodically as part of preventative maintenance or inspection. These devices are manufactured in accordance with provisions of the ASME Boiler and Pressure Vessel Code (ASME B&PV Code), Section VIII.They are certified by the National Board through a program that tests samples for correct burst pressure and flow resistance.Get Price

  • Boiler/Burner Combustion Air Supply Requirements and

    Heat loss from the boiler jacket could range from 1/2% to 4% of the boiler output, depending upon operating pressure or temperature, boiler size, type of construction, and insulation thickness. Typically, the larger the boiler the lower the loss as a percentage of boiler output.Get Price

  • Burnham boilers

    I have a CHG 150 direct vent, gas hot water boiler, I installed it in January 2013 it has worked fine. 2013, 2014, 2015. I brought up, my water level to clear the low water safety, I put a little water in the condensate tube at the bottom to create a neg. draw.Get Price

  • 1.2. Process Flow Diagram (PFD) | Diagrams for

    Jul 03, 2012 · The first exchanger cools the effluent gas and generates steam needed in the plant. The second exchanger uses cooling water to reach the desired exit temperature of 38°C. These exchangers are to be designated as E-107 (reactor effluent boiler) and E …Get Price

  • Continuity Equation Questions and Answers | Study.com

    Water enters a boiler through a tube with a 130 mm inner diameter at 6 MPa and 65 C, and leaves the tube at 5 MPa and 450 C with a velocity of 80 m/s. Find (a) the velocity of …Get Price

  • Continuity Equation Questions and Answers | Study.com

    Water enters a boiler through a tube with a 130 mm inner diameter at 6 MPa and 65 C, and leaves the tube at 5 MPa and 450 C with a velocity of 80 m/s. Find (a) the velocity of …Get Price

  • Boiler/Burner Combustion Air Supply Requirements and

    Heat loss from the boiler jacket could range from 1/2% to 4% of the boiler output, depending upon operating pressure or temperature, boiler size, type of construction, and insulation thickness. Typically, the larger the boiler the lower the loss as a percentage of boiler output.Get Price

  • Ask HN: What are the best-designed things you've ever used

    The BDB includes features that can cost literally 5X as much on Italian machines (stainless steel boilers, a preheating tube that pulls brew water through the steam boiler first, an electrically heated grouphead, etc.) but it still has fantastic temperature stability.Get Price

  • Specification of Rupture Disk Burst Pressure

    Rupture disks are replaced after actuation or periodically as part of preventative maintenance or inspection. These devices are manufactured in accordance with provisions of the ASME Boiler and Pressure Vessel Code (ASME B&PV Code), Section VIII.They are certified by the National Board through a program that tests samples for correct burst pressure and flow resistance.Get Price