combined 700 bhp condensing boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price
Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price
A fan is supplying forced draft into a boiler has the following specifications on its name plate: Capacity. 280 m3/min. Air temp. 25C. Total pressure. 4 cm WC. Motor Rating. 5 Hp; 1200 rpm. A tabular air heater is installed in line with the boiler, and the fan is now required to supply heated air for combustion at 90C.Get Price
Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Boiler q = h2 – h1 2. Condenser q = h1 – h2 3. Refrigeration or Evaporator q = h1 – h2 4. Nozzle V22/2 – V12/2 = h1 – h2 The heat transfer to the heat engine is 2000KJ and net work output of combined engine refrigerator plant is 360KJ. Evaluate the heat transfer to the refrigerator and the net heat transfer to the reservoir at Get Price
ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price
Boiler q = h2 – h1 2. Condenser q = h1 – h2 3. Refrigeration or Evaporator q = h1 – h2 4. Nozzle V22/2 – V12/2 = h1 – h2 The heat transfer to the heat engine is 2000KJ and net work output of combined engine refrigerator plant is 360KJ. Evaluate the heat transfer to the refrigerator and the net heat transfer to the reservoir at Get Price
Dec 12, 2021 · She is powered by a single Mitsubishi Kobe 7UEC45LA 7 cylinder 2 stroke main engine, producing 8,401 bhp (6,179 kW) to drive a fixed pitch propeller for a service speed of 14.3 knots. Her auxiliary machinery includes three generators providing 1,090 kW, and she has a Tortoise vertical, oil fired, boiler.Get Price
Dec 12, 2021 · She is powered by a single Mitsubishi Kobe 7UEC45LA 7 cylinder 2 stroke main engine, producing 8,401 bhp (6,179 kW) to drive a fixed pitch propeller for a service speed of 14.3 knots. Her auxiliary machinery includes three generators providing 1,090 kW, and she has a Tortoise vertical, oil fired, boiler.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Boiler q = h2 – h1 2. Condenser q = h1 – h2 3. Refrigeration or Evaporator q = h1 – h2 4. Nozzle V22/2 – V12/2 = h1 – h2 The heat transfer to the heat engine is 2000KJ and net work output of combined engine refrigerator plant is 360KJ. Evaluate the heat transfer to the refrigerator and the net heat transfer to the reservoir at Get Price
ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price
A A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3 boiler rating is 200%, boiler efficiency is 65% heating surface area is 0.91 m^3 per bo.Hp, and the heating value of fuel is 18,400 Kcal/kg. the total coal available in the bunker is 50,000 kg. determine the no, of hrs to consume the available fuel.Get Price
A fan is supplying forced draft into a boiler has the following specifications on its name plate: Capacity. 280 m3/min. Air temp. 25C. Total pressure. 4 cm WC. Motor Rating. 5 Hp; 1200 rpm. A tabular air heater is installed in line with the boiler, and the fan is now required to supply heated air for combustion at 90C.Get Price
Dec 12, 2021 · She is powered by a single Mitsubishi Kobe 7UEC45LA 7 cylinder 2 stroke main engine, producing 8,401 bhp (6,179 kW) to drive a fixed pitch propeller for a service speed of 14.3 knots. Her auxiliary machinery includes three generators providing 1,090 kW, and she has a Tortoise vertical, oil fired, boiler.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
A A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3 boiler rating is 200%, boiler efficiency is 65% heating surface area is 0.91 m^3 per bo.Hp, and the heating value of fuel is 18,400 Kcal/kg. the total coal available in the bunker is 50,000 kg. determine the no, of hrs to consume the available fuel.Get Price
Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price
A A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3 boiler rating is 200%, boiler efficiency is 65% heating surface area is 0.91 m^3 per bo.Hp, and the heating value of fuel is 18,400 Kcal/kg. the total coal available in the bunker is 50,000 kg. determine the no, of hrs to consume the available fuel.Get Price
A fan is supplying forced draft into a boiler has the following specifications on its name plate: Capacity. 280 m3/min. Air temp. 25C. Total pressure. 4 cm WC. Motor Rating. 5 Hp; 1200 rpm. A tabular air heater is installed in line with the boiler, and the fan is now required to supply heated air for combustion at 90C.Get Price